Professional Summary
Registered Practicing Professional Hydraulic and Water Resources Engineer with over 10 years of professional experience in Ethiopia and Tanzania. He holds a BSc in Hydraulic and Water Resources Engineering, an MSc in Structural Engineering and an MA in Project Leadership and Management. His career covers feasibility studies, detailed design, construction supervision, contract administration and operation and maintenance planning for dams, hydraulic structures and small- to large-scale irrigation schemes. He has held senior engineering, resident engineering, project management and Water and Agriculture Resources Director roles at ADSWE, Amare and Families Consulting Engineers and the Engineering Corporation of Oromia. Since September 2026, he has served as Hydraulic and Assistant Resident Engineer at Continental Consultants (Pty) Ltd, supporting construction supervision of dams and irrigation schemes in the Ruvuma Region of Tanzania. His portfolio includes the Awash and Dawa-Genale Multipurpose Development Projects, Anger Dam, Upper Ribb and Gilgel Abay. He is interested in multidisciplinary dam and irrigation development, design optimization, climate-resilient infrastructure, environmental and social safeguards and capacity building.
Key Expertise
Major Projects and Contributions
-
Construction Supervision of Dams and Irrigation Schemes – Ruvuma Region, Tanzania
Continental Consultants (Pty) Ltd; Assistant Resident Engineer, September 2026–present. Supports contract supervision, quality assurance, progress monitoring, payment estimates, design reviews and construction modifications. Reported contract value: USD 30.48 million. -
Lega Robi, Kombolcha and Tije Small-Scale Irrigation Projects
Engineering Corporation of Oromia (ECO); Headwork Design Engineer, August–September 2026. Feasibility and detailed design of diversion weirs, energy dissipation structures, seepage protection, head regulators and related structures; geotechnical assessment, drawings and cost estimates. -
Hadha Finna Irrigation Project
ECO; Irrigation Design Engineer, July–August 2026. Feasibility and detailed design of surface irrigation networks, canals, reservoirs, gated structures and drainage infrastructure, including BOQs and O&M planning. Reported contract value: USD 5.73 million. -
Awash and Dawa-Genale Multipurpose Development Projects
ECO; Irrigation Design Engineer, May–July 2026. Inception and pre-feasibility studies covering command-area delineation, main canal alignment, hydraulic structures, drainage, flood protection, preliminary costs and multidisciplinary coordination. CV reports a combined project contract value of USD 1.25 billion. -
Yabelo Medium-Scale Dam and Irrigation Development Project
ECO; Dam, Main Canal and Structural Design Engineer, February–May 2026. Feasibility and detailed dam, canal, spillway, intake and auxiliary structure design, technical documentation, risk assessment, costing and O&M planning. -
Qumbi Irrigation Development Project
ECO; Irrigation Design Modification Engineer, December 2025–January 2026. Revised canal alignments, hydraulic sections, drainage and flood protection, with revised cost estimates and design documentation. -
Golelcha Dam and Irrigation Development Project – Spillway
ECO; Structural Engineer, August–September 2025. Spillway design modification, design floods and reservoir routing, hydraulic performance, energy dissipation, structural and geotechnical design, costing and construction support. -
Anger Dam and Irrigation Development Large-Scale Project
ECO; Senior Irrigation System Design Engineer, May–November 2025. Feasibility and detailed design of main, secondary and tertiary canals, control and drainage structures, hydraulic modelling, BOQs and O&M frameworks. -
Telef Small-Scale Irrigation Project
Amare and Families Consulting Engineers (ABCE); Project Manager and Headwork and Irrigation System Design Engineer, February–March 2025. Feasibility, surface irrigation and structural design, cost estimates, stakeholder coordination and O&M planning. -
Awadi Geberoch Small-Scale Irrigation Project
ABCE; Project Manager and Headwork and Irrigation System Design Engineer, November 2023–January 2024. Site and resource assessment, irrigation layout, canals, gates, reservoirs, structural design, budgeting and operational planning. -
Akobo Gedu Dima, Geji Semuy Godere, Gebuyi Kumi Mengesh and Gillo Tata Gog Irrigation Projects
ABCE; Project Manager and Headwork and Irrigation System Design Engineer, February–October 2023. Feasibility and detailed design of four medium-scale irrigation projects, gravity-fed networks, diversion weirs, drainage, cost estimates and environmental safeguards. -
Badhamo, Kurinchit and Ayshit Demale Small-Scale Irrigation Projects
ABCE; Freelance Headwork and Irrigation System Design Engineer, June–October 2022. Feasibility, hydraulic and structural design, technical documentation, contract planning and commissioning support. -
Technical and Financial Proposals – Water and Irrigation Projects
ABCE; Headwork and Irrigation System Design Engineer, February 2023–April 2025. Prepared technical methodologies, staffing plans, work schedules, risk assessments and financial proposals for competitive bids. -
Gilgel Abay Dam and Irrigation Development Project – Detailed Design
ADSWE (now Lihiket Design and Supervision Corporation); Structural Design Engineer, April–September 2021. Structural design of large-scale irrigation infrastructure, hydraulic modelling, reinforcement details, BOQs and environmental mitigation. -
Upper Ribb Large-Scale Irrigation Project – Design and Construction
ADSWE; Irrigation and Structural Design Engineer and Site Engineer, August 2020–March 2021. Feasibility, gravity-fed canal networks, hydraulic structures, structural design, BOQs, construction quality control, commissioning and handover. Reported contract value: USD 38.38 million. -
Gibana Dam Irrigation Project
ADSWE; Dam Design Engineer, July–October 2019. Feasibility, dam and canal design, spillways, sluice gates, regulators, flumes and other hydraulic structures, BOQs and risk assessment. -
Engudadar Embankment Masonry Dam
ADSWE; Dam Design Engineer, July–October 2016. Feasibility and detailed dam design, hydrological assessment, spillways, canals, materials and stability analysis. -
Fetam Tajet Irrigation Project – Construction
ADSWE; Resident Engineer. Supervised construction, quality and safety compliance, design modifications, payment certification, testing, commissioning, handover and Water User Association training. -
Ateba-2 Small-Scale Irrigation Project – Construction
ADSWE; Resident Engineer, November 2019–July 2020. Construction supervision, contractor submittals, quality control, BOQs, variations, commissioning and O&M training. -
Bahir Libo Small-Scale Irrigation Project – Construction
ADSWE; Resident Engineer, May 2018–June 2019. Construction supervision, working drawings, payment certification, quantity take-offs, commissioning and handover. -
Gilgel Abay Diversion Irrigation Project – Construction
ADSWE; Resident Engineer, November 2016–April 2018. Supervised works, quality control, design modifications, payments, commissioning, handover and operational training.
Scan to download